Day 1 – Start Section 6 – Vertical spar

After an inspiring week in Oshkosh at EAA AirVenture, I finally started actually building the plane! Things seemed to be going great, then I realized I had made a mistake. The instructions said to match-drill the spar caps on the spar web using 1/8″ holes. I did this and then realized that the holes on […]

Read More

Setup air lines

The other night i ran some pex air hose around the perimeter of the workshop and installed multiple air stations to plug air tools into. Next week ill be at Oshkosh where ill hopefully get the hang of riveting so i can actually start building.

Read More